Background

Site history

The site was first identified for development in 2009 as the proposed location for a new Bristol City FC stadium. Although that project did not go ahead, the site’s suitability for development was established.  

In 2021, a new planning application was submitted for up to 510 homes on the northern part of the site, alongside a separate application for the Ashton Gate Sporting Quarter to the south. After public consultation and technical assessment, outline planning permission was granted in 2023.   

We are now bringing forward a Reserved Matters application to Bristol City Council to agree the detailed design, layout, and landscaping of the new neighbourhood.  

The site

The Longmoor site lies between Ashton Vale and Long Ashton and was formerly used as a commercial tip for building materials. While it sits within the Green Belt, it is classed as brownfield land, and outline permission was granted in 2023 under an exception policy.  

Although the site is technically within the Green Belt, it does not have the characteristics most people associate with protected countryside. It is a former tip, bounded by existing development and transport infrastructure.  

The Metrobus M2 route and South Bristol Link Road have broken the connection to the wider countryside. This creates a new defensible boundary to the Green Belt and makes Longmoor a sustainable, well-located site for homes.  

The development does not set a precedent for nearby land and delivers much-needed new and affordable housing. With a shortage of housing in Bristol and limited brownfield capacity left, Longmoor is a practical and appropriate location for a new neighbourhood.  

Outline planning permission

The detailed design in our proposals must comply with the parameter plans that were agreed with Outline Planning permission:

  • Access and Movement Parameter Plan  
  • Building Heights Parameter Plan  
  • Green Infrastructure Parameter Plan  
  • Development Extents & Land Uses